| Using ratchet style, hydraulic torque wrenches, TETRA professionals install and remove blowout preventors (BOPs), casing valves and wellhead equipment. In addition to BOP and nipple up/nipple down services, TETRA performs pressure testing of BOP stacks, production manifolds, casing strings, and flowlines up to 15,000 psi. |
|